We are now accepting orders for Wind Harvester®4.0 and 4.S turbines for delivery in 2026 and 2027.

Secure your next-generation wind energy solution today!

Why Choose Wind Harvesters?

✔ Advanced technology for turbulent and mid-level wind

✔ Available with different tower heights and types to fit your project needs

✔ Designed for easy integration with solar and battery storage

✔ Models available for Category 5 hurricane and extreme salt conditions

8-year standard warranty, with an optional 12-year extended warranty

Ordering Process

We make it easy to evaluate and plan your projects and then order your Wind Harvesters.

Step 1: Project Assessment

We help you determine if our turbines are the right fit for your location. Key factors include:

  • Average wind speed at 12m-20m above ground (assessed via UL’s Windnavigator)
  • Local electricity costs
  • Project size, distance to transmission line, feasibility & profitability analysis

We prioritize larger projects (500kW+) for 2026 but will consider smaller projects if they have potential for expansion.

Step 2: Financial Planning & Incentives

We assist in:

Estimating full project costs (including installation, grid connection, permitting, and O&M)

Identifying tax credits & grants to lower project expenses

Preparing a pro forma financial plan

Securing financing—until traditional lenders recognize our turbines as collateral

Bigger projects = bigger savings! The more turbines you order, the lower the per-unit and installation costs.

Step 3: Order & Delivery

  • Choose your preferred specifications (generator size, tower type and height, turbine colors, extended warranty)
  • Finalize a price and delivery date
  • Sign the agreement & take the next step in the project development process

PROJECT INQUIRY

Tell us about your project, and we’ll get back to you soon!
Project Details
Microgrid?
Turbine Specifications & Options
Turbine type
Generator size
Blade material
Tower type
Blade tip height
Extended warranty (8 years standard)
Additional Questions
Do you know of other properties that would benefit from Wind Harvesters?
Are you in the project development business?