We are now accepting orders for Wind Harvester®4.0 and 4.S turbines for delivery in 2026 and 2027.
Secure your next-generation wind energy solution today!
Why Choose Wind Harvesters?
✔ Advanced technology for turbulent and mid-level wind
✔ Available with different tower heights and types to fit your project needs
✔ Designed for easy integration with solar and battery storage
✔ Models available for Category 5 hurricane and extreme salt conditions
✔ 8-year standard warranty, with an optional 12-year extended warranty
Ordering Process
We make it easy to evaluate and plan your projects and then order your Wind Harvesters.
Step 1: Project Assessment
We help you determine if our turbines are the right fit for your location. Key factors include:
- Average wind speed at 12m-20m above ground (assessed via UL’s Windnavigator)
- Local electricity costs
- Project size, distance to transmission line, feasibility & profitability analysis
We prioritize larger projects (500kW+) for 2026 but will consider smaller projects if they have potential for expansion.
Step 2: Financial Planning & Incentives
We assist in:
✔ Estimating full project costs (including installation, grid connection, permitting, and O&M)
✔ Identifying tax credits & grants to lower project expenses
✔ Preparing a pro forma financial plan
✔ Securing financing—until traditional lenders recognize our turbines as collateral
Bigger projects = bigger savings! The more turbines you order, the lower the per-unit and installation costs.
Step 3: Order & Delivery
- Choose your preferred specifications (generator size, tower type and height, turbine colors, extended warranty)
- Finalize a price and delivery date
- Sign the agreement & take the next step in the project development process
PROJECT INQUIRY