We are taking orders for Wind Harvester 4.0 turbines for delivery in 2025-27.  Turbine specifications are here. Use the form below to choose among options for components. The ordering process includes:

  • 1

    We will help you assess the potential of our turbines for your project. If the combination of wind speed to the price of electricity would likely make for a profitable project, we will help you with a more advanced evaluation. The first thing we do is use UL’s Windnavigator predicted average annual wind speeds at 12m to 20m above ground level for the lat-long or address you send us. That, plus the local cost of electricity is all we initially need.

  • 2

    We prioritize larger projects over smaller ones. We won’t be doing small (<500kW) projects in 2025 unless these will likely lead to larger installations at that site or in the nearby region.

  • 3

    We will work with you to estimate full project costs, assess the opportunities for tax subsidies and grants, and help you prepare a project pro forma. If the wind speed to PPA ratio is marginal, a few months of wind speed measurements on the site will likely be needed.

  • 4

    Turbine prices will be set by the size of the project. The more ordered, the lower the per turbine price. Installation, grid connection, permitting, and O&M costs also drop significantly per installed kW with larger projects. Distributor licensees receive 25% of the margin on the sale.

  • 5

    We help our customers secure project financing until traditional funding sources will accept our turbines as collateral for loans.

  • 6

    Wind Harvesters come with a three-year warranty and the option to secure a ten-year extended warranty.

We look forward to hearing from you about the windy property you hope to develop. Please fill in this form and send us as much information as you can.

PROJECT INQUIRY

Please fill out as much of the form as you wish. We will respond to you soon.
About your potential project
Specifications and options. Which would you prefer?
Generator
Aluminum blade
Batteries
Tower
Height of blade tips
Extended warranty
Other questions
Yes, a number of neighboring properties may be good candidates.
Are you interested in becoming a distributor?
Are you an investor in Wind Harvest?